Corriform The Original polypropylene sub ground concrete shutter system
About Corriform Benefits Material Selection Process Installation Pile Cap Formers Accessories Technical Contact Corriform
Pile Cap Formers
square pile cap former pre fill
square pile cap former post fill
example of a large 4.5x1.5M
pile cap former fully
encapsulated, prefabricated
and ready for placement.
As with the installation of ground beam formers, methods vary.

Corriform, using information taken from the project drawings, will design the pile cap former giving the best option relative to the dimensions and complexity of the foundation layout.

When this has been considered the former must be designed to give optimum material usage for Corriform plus the most effective assembly method for the contractor.

The two aforementioned methods of installation are much along the same lines as ground beam installation methods with much the same preparation.

The benefits of the out of the 'out of the ground' prefabrication method, is that it enables shuttering to be progressing whilst digging or ground problems are overcome.

Corriform offers concrete pad construction where no heavy reinforcement steel is involved. An internal support frame enabling internal support, is fabricated in lightweight steel to support the prefabricated shutter. Where small pads in the region of 300mm x 300mm x 300mm can offer concrete containment without too much concrete loss.

Where pile cap formers are manufactured it is always advisable to use the higher Corriform grades.

Please contact Corriform for construction methods!

triangular example rectangular example
All of these pile cap former designs come fully encapsulated,
flat packed and ready to assemble
Pile cap assembled, installed and ready for backfill
About Corriform Benefits Material Selection Process Installation Pile Cap Formers Accessories Technical Contact Corriform

AsOne new media