 |
|
 |
 |
 |
Fold up Corriform sides,
push Corripins firmly down flutes and tape if necessary. Secure
Corriform to steel reinforcement through corriform sides thus
fixing shuttering mechanically enabling complete unit to be
lifted as one unit into position into prepared trench.
Note: Not forgetting to cut base holes to accommodate pile steel
through.
|
|