 |
out of ground fabrication |
 |
 |
 |
Prepare flat trench base
at the correct depth.
There is no need to concrete blind the trench base as long as
it has no cavities and is levelled firmly. The Corriform base
acts as the clean level working surface.
If necessary use a light sand blinding.
Note: Where levels are a concern increase the Corriform shutter
height.
|
|